
What is confirmed
Project: Guangzhou Medical University New Campus Phase 2. Location: Guangzhou, Guangdong. Industry: laboratory and research. Project area: 40,000 square metres, as stated in the public project record. Wall materials named in the record: magnesium rock wool panels and machine-made panels.
The project record lists the following building types: academic exchange centre, talent apartments, animal centre, technology building and public building facilities. Those building types are reproduced here as listed, without adding further buildings or room-level detail that the record does not give.
How to use this case
University laboratory projects mix several building types in one phase, so wall planning should be organised building by building and room by room. An academic exchange centre, a technology building and an animal centre do not share the same wall requirements, even within one project phase. Send the building and room list for your own project and confirm the wall construction, joint and surface for each building type.
This case replaces an earlier laboratory case page on this site. The earlier laboratory project, which used a different core material, is covered as a full case page on the material-specialist site for that core, and this site carries only a single-sentence reference to it on the laboratory application page. No schedule, contract value or cleanliness grade is stated here, because the record does not give those fields.
Planning a similar laboratory wall? Send your building and room list and ask which wall system suits each building type.
Send a wall-system enquiryPlease confirm minimum order quantity and lead time before ordering.