
Selection logic, not a material catalogue
This is the only material-angle page on this site, and it is deliberately a guide, not a catalogue. It explains selection logic — which material direction suits which room, and what trade-offs to weigh — without publishing a material specification table or a material detail page. Material detail pages belong to the material-specialist sites in the wider project.
The selection logic used here follows the company's customer guidance, attributed as such. Laboratories are guided towards panels described as antibacterial, mould-resistant, easy to clean and fire-resistant. Biopharmaceutical projects are guided towards panels described as antibacterial, dust-free, tightly jointed and easy to clean. Food plants are guided towards rock wool directions for moisture, hygiene and dust-resistant joints. Those are guidance tendencies, not measured guarantees for any panel.
Working through the choice
Start from the room, then weigh four factors: cleanability, joint tightness, reconfigurability and service accommodation. A room that changes often weighs reconfigurability highly. A production room weighs joint tightness and cleanability highly. A corridor weighs durability under traffic. No single material direction wins on all four factors, so the guide ends with a shortlist to confirm, not a single answer.
For the two panel detail pages on this site — the handmade wall panel and the inorganic precoated panel — the detail pages give the construction and finish facts for those panels. For every other material direction, this guide is the endpoint on this site: it states the selection logic and directs the enquiry to confirm the exact panel, joint and surface for each room. Please confirm minimum order quantity and lead time before ordering, and ask for any material figure to be confirmed for the exact panel ordered.
Compare the wall options for your rooms, then send the shortlist for confirmation — panel, joint, surface and colour, room by room.
Send a wall-system enquiryPlease confirm minimum order quantity and lead time before ordering.